LIVE··
Intelligent Value Chain EcosystemEST · 2026
TRUCKINGCUBE

Ultra cold chain operations,
end-to-end controlled.

One platform. Six modules. Every shipment. Every degree. Always in view — from dispatch sign-off to ULT transfer at the receiving dock.

CategoriesCold ChainUltra Cold ChainVaccinesReagentsQuality Control SamplesBiologicsCompounds
01INFRASTRUCTURE02IT PLATFORM03SOPs04TRANSIT05DELIVERY06AUDIT
TruckingCube  ·  Six pillars, one ecosystem
−80°C
Floor
ULT operating envelope
<15
Min
Alert acknowledgement SLA
68
Controls
Across dispatch · transit · delivery
5 yr
Retention
Audit-grade record archive
Capability stack

Built for ultra cold chain.

Six pillars of infrastructure and readiness — every shipment is engineered before it moves. From −80 °C truck-boxes to a control tower that never sleeps, every link is owned, audited, and instrumented.

01
−72°C ✓−72°CUCC PORTABLE

Reefer Trucks & Portable Coldboxes

  • Dual-zone reefers + IATA passive coldboxes, −80 °C to +25 °C
  • Battery backup, calibrated probes, on-board IoT loggers
  • Pre-cool SOP & door-to-door temperature continuity
02
CTRL TOWER · LIVE3 ALERTS42 OK2 NCRTMS · 24/7

Transit Support & Control Tower

  • 24×7 live IoT temp + GPS dashboard
  • Alert SLA <15 min · escalation matrix wired
  • Driver hotline · safe-haven dry-ice top-ups
03

Air · Road · Rail Network

  • Air freight DGR-2 partners across BOM·DEL·BLR·HYD
  • Dual-zone reefer fleet on national corridors
  • Reefer rail nodes for long-haul efficiency
04
SOPTMSQMSALERTTRUCKINGCUBE PLATFORM

IT Platform & Stack

  • TMS · QMS · WMS unified on a single platform
  • IoT loggers · GPS · alerting · audit trail
  • API-ready for shipper, customer, regulator
05
QA·COSIGNEDQAAPPROVED

Compliance & QA Officer

  • Dedicated QA Manager + dispatch QA officer
  • NCR & deviation workflow inside QMS
  • CMVR · IATA DGR · Schedule M sign-off owner
06
−80°−80°+2..8°+15..25

Storage Warehouse

  • Multi-zone: ULT −80, frozen, 2–8 °C, ambient
  • Mapped, qualified & 24×7 monitored
  • Schedule M + WHO PQS audit-ready
Single source of truth

One platform. Six modules. Every shipment.

TruckingCube unifies SOP execution, transit telemetry, delivery quality gates, and alert escalation under a single audit-grade platform. Every state change is logged, every breach is escalated, every record is retained for five years.

SOP LibraryProcess EngineTransit TrackerDelivery GateAlert & EscalationAudit TrailTRUCKINGCUBEPLATFORM
SOP Library
Versioned phase checklists with proof requirements
01
Process Engine
Dispatch · Transit · Delivery state machine
02
Transit Tracker
Live IoT telemetry, GPS, dry-ice top-ups
03
Delivery Gate
Pre-acceptance checks · ULT transfer in 10 min
04
Alert & Escalation
Drift · excursion · tamper triggers, ladder timer
05
Audit-Grade Trail
Every state change retained for 5 years
06
Three phases · 68 controls

From release gate to ULT transfer, every step measured.

Each shipment follows three sealed phases with explicit gates, owners, and proof requirements. No phase advances until the previous one is signed off. Excursions raise an NCR within four hours and quarantine the load until disposition.

01
Dispatch
22 controls · dual sign-off
Container pre-cool to −78 °C verified
Logger armed, baseline within ±2 °C
Dry-ice charge per 1.5× sublimation rule
DG paperwork · UN1845 · IATA DGR-2 packed
QA Manager + Warehouse Supervisor sign-off
Sealed container photographed with timestamp
PhaseDISPATCHSOPAudit-grade
02
Transit
22 controls · escalation triggers
Continuous logger uplink every 2 min
Drift / excursion engine — 4 trigger types
Cross-dock dwell ≤5 min, CoC seal verified
Dry-ice top-ups at scheduled safe havens
15-min ack ladder · driver → CT → LM
Tamper photo evidence captured per handoff
PhaseTRANSITSOPAudit-grade
03
Delivery
24 controls · ULT in 10 min
Receiver notified ≥60 min before arrival
Logger pre-acceptance gate before container open
Open container photo with timestamp
ULT transfer completed within 10 min
Receiving QA sign-off · NCR if excursion
All records sealed into 5-year audit archive
PhaseDELIVERYSOPAudit-grade
<15
Alert ack SLA
Minutes
≤5
Cross-dock dwell
Minutes
≤10
ULT transfer
From open
5 yr
Record retention
Audit-grade
Excursions trigger immediate quarantine.
Outside −58 °C / −82 °C raises a HIGH severity alert and an NCR within four hours. The shipment is held until QA disposition — accept, additional testing, or reject.
Escalation matrix
Confidential · Retain 5 years from issue dateUCC SOB v1.0